6 March 2015

Mega Block on 8.3.2015

MEGA BLOCK o­n 8.3.2015



Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 8.3.2015.



MATUNGA-MULUND DN FAST LINE FROM 10.45 AM TO 3.15 PM



All Dn fast services leaving Chhatrapati Shivaji Terminus Mumbai from 10.08 am to 2.54 pm will be diverted o­n Dn slow line at Matunga and will halt at all stations between Sion and Mulund. Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund. These services will arrive destination 20 minutes behind schedule.



All Up fast services leaving Thane from 10.46 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.



All slow services arriving and leaving Chhatrapati Shivaji Terminus Mumbai between 11.00 am and 5.00 pm will arrive destination 10 minutes behind schedule.



PANVEL-NERUL UP AND DN HARBOUR LINES FROM 11.00 AM TO 3.00 PM



Up Harbour line services towards Chhatrapati Shivaji Terminus Mumbai leaving Panvel from 10.43 am to 3.27 pm will remain suspended between Panvel and Nerul and Dn Harbour line services to Panvel leaving Nerul from 10.41 am to 3.17 pm will remain suspended between Nerul and Panvel.



Up Transharbour line services towards Thane leaving Panvel from 11.05 am to 3.19 pm will remain suspended between Panvel and Nerul and Dn Transharbour line services from Thane to Panvel leaving Nerul from 11.42 am to 2.48 pm will remain suspended between Nerul and Panvel.



Panvel - Andheri services will remain cancelled during the block.



However, special local trains will run o­n Chhatrapati Shivaji Terminus Mumbai– Nerul Harbour line section and Thane – Nerul Transharbour line section during the block period.